What goes in a snagging report

A snagging report has two jobs: to tell each trade exactly what to fix, and to show the client what was found and closed.

A cover page

  • The project name, reference and site address.
  • Who the report is for, who prepared it, and the date.
  • A summary: how many snags, and how many at each status.
  • If the report is for one company, say so, for example "Snags for Smith Brickwork".

Plans with pins

A drawing of each area with every snag pinned and numbered shows at a glance where the work is. Trades can plan their visit, and clients can see coverage across the building.

Each snag

  • Its number and title.
  • The location, and a snippet of the plan showing its pin.
  • The photo, with its mark-up.
  • Who it's assigned to, the due date and its status.
  • Comments and changes, with who and when, if the reader needs the history.

One report, or one per trade

Send each subcontractor a report of only their snags, grouped by area. They see what's theirs without wading through everyone else's. For the client, a full report grouped by status or by area shows progress.

Sign-off

When the snags are closed, a signed report records that the work was checked and accepted, and when. Keep that version with the project's handover records.

Spreadsheets as well as PDFs

A spreadsheet version helps anyone tracking numbers across a large job, sorting by trade, or bringing the list into their own system.